ClientFairhill Farm
-
Location62 Mt Vincent Road, Mulbring, NSW 2323
-
Asphalt overlay LT10 x 50mm - Estimated area 600m2 (72 tonnes)
Asphalt overlay LT10 x 30mm - Estimated area 1,700m2 (123 tonnes)
SCOPE OF WORKS:
Asphalt overlay LT10 x 50mm - Estimated area 600m2 (72 tonnes)
Asphalt overlay LT10 x 30mm - Estimated area 1,700m2 (123 tonnes)
Inclusions:
Complete occupational safety requirements – including documentationBase prepared by In-situ StabilisationKey in edges to ensure smooth transitionsSweep area clean of loose materialDisposal of excess spoil to be stockpiled onsiteSupply & spray tack coat of emulsionSupply, deliver & lay average 60mm of asphaltic concrete (compacted 50mm Light Traffic LT10) using Asphalt Paving Machine – Estimated area 600m2 (To Entry, where trucks screw & culverts)Roll & compact with Steel Drum Roller & Multi Tyre RollerSupply, deliver & lay average 36mm of asphaltic concrete (compacted 30mm Light Traffic LT10) using Asphalt Paving Machine – Estimated area 1,700m2Roll & compact with Steel Drum Roller & Multi Tyre RollerClean & tidy areaCompaction testing
Duration of Job: 3 Days
.