ClientHunter Water
-
LocationCorner Anderson and Woodberry Drive - Tarro
-
Proof roll existing base and shape to sheet water to side drain, road, and PVC drain
SCOPE OF WORKS:
Proof roll existing base and shape to sheet water to side drain, road, and PVC drain
In-Situ Stabilise failed area with 2% cement to 200mm deep - estimated area 80m2
Asphalt overlay Heavy Duty AC14 x 42mm - Estimated area 715m2 (74 tonnes)
Inclusions:
- Complete occupational safety requirements – including documentation
- Base is as per existing
- Profile/sweep failed pavement areas ready for correction of asphalt
- In-Situ stabilise to 200mm deep failed areas with 2% cement – Estimated 80m2 area
- Supply and install 100mm PVC drain to edge of concrete in front of shed (NB Hunter Water to run and connect pipe from 100mm PVC drain into existing cable drain)
- Proof roll existing base and shape to sheet water to side drain, road, and PVC drain
- Supply, deliver & lay road base as required for shaping
- Key in edges to ensure smooth transitions
- Sweep area clean of loose material
- Disposal of excess spoil to stockpiled onsite
- Supply & spray tack coat of emulsion
- Supply, deliver & lay correction layer asphaltic concrete (AC10) to failed sections – Estimated 80m2
- Supply, deliver & lay average 50mm of asphaltic concrete (compacted 42mm Heavy Duty HD14) using Asphalt Paving Machine – Estimated area 715m2Roll & compact with Steel Drum Roller & Multi Tyre Roller
Total Area 715m2 (75 tonnes)
Duration – 1 Day
.